News

Behind the scenes at PARC: 2025 a year of improvements

2025 was a significant year for our Asset and Facilities Team. Working in close partnership with Frankston City Council, we delivered a wide range of upgrades and maintenance works across the Centre, all focused on improving safety, reliability and the everyday experience for our members and the community. 

Much of this work happens quietly in the background, but its impact is felt every day. In recognition of this consistent commitment to quality and care, PARC was named Facility of the Year Large at the Aquatics & Recreation Victoria (ARV) Excellence Awards in June – a reflection of the standards our team works to, day in and day out. 

This year, our Asset and Facilities team completed 1,238 planned and reactive maintenance and upgrade projects. That’s over 3 bits of work per day. We also and had 2,145 contractors through our doors, helping us to deliver these improvements.  

Here are some of our major asset improvement works of 2025: 

Tiling Upgrade Project 

This year we made a huge undertaking and completed a tiling replacement project within our Centre, to ensure the life of the building remains fit-for-purpose and safe for the community. The areas that were restored included:  

  • The Main Female and Male Downstairs change rooms
  • The Upstairs Female and Male change rooms 
  • Communal shower   
  • Warm Water Pool Hall entrance  
  • Warm Water Pool Hall Disability change rooms 
  • Warm Water Pool Hall change rooms
  • Main 50m Pool 

This project also extended to the refurbishment of our Sauna, which was retiled, and re-panelled.  

New Boiler  

Earlier this year, following an unexpected fault, a new boiler unit was installed in just 12 days! Our incredible team worked around the clock to get it done, ensuring reliable water temperatures across our pools and showers and further uninterrupted operations for members. 

Water Slide & Tower refurbishment project 

As part of our ongoing dedication to maintaining high-safety standards, we completed important structural works on both of our Raft Waterslides. This project included the recaulking of the slides, replacement of both conveyor belts, corrosion prevention works on the slides’ structure, slide tower treatment works, slide fibreglass refurbishment and the conveyor belt shade replacement.  

Instillation of Lynxight drowning prevention technology  

This year we implemented a new AI-powered, advanced pool monitoring drowning detection system, to further strengthen water safety within our Centre.  

This innovative drowning prevention system is designed to work alongside our lifeguards, monitoring our Main 50m pool, Leisure Pool and Warm Water Pool through CCTV cameras and enabling our lifeguards to respond up to six times faster to potential emergencies.

Our lifeguards are now equipped with smartwatches that are linked to Lynxight’s alert platform, delivering real-time notifications, and helping them respond quickly and decisively in critical moments.  

PARC Reformer Pilates Studio opening  

One of our most exciting projects this year was the opening of our Reformer Pilates Studio. This dedicated, contemporary Reformer Pilates studio, offers virtual, on demand and instructor led classes. The feedback on this new space has been overwhelmingly positive, and we love seeing members enjoy this boutique-style accessible space.  

Upgrades to heating and cooling through the Centre (HVAC Project) 

Most recently, we completed extensive upgrades to our air circulation and climate control systems across the building, including the replacement of our rooftop chiller unit, to ensure better air quality, improved comfort, and long-term reliability throughout our facility.  

Thanks for your patience 

From the whole team at PARC, we would like to extend a massive thank you to you, our fantastic members and patrons, for your ongoing patience and support throughout these upgrades. We know these works have come with disruptions, so we really appreciate you for bearing with us throughout. Reinvesting in the safety, and longevity of the building and its facilities for our members and community, is a huge priority for us, and we strive to make everyone’s experience at PARC, a positive one. 

We hope that you enjoy the improvements made and look forward to another year together at PARC! 

Share this article

We're excited to share some splash-tastic news with our community! 🥳🤩

We will be extending our sister site, PINES' 2025/2026 summer season until Sunday 19 April! Typically, our beloved outdoor PINES pool operates from November 1 to March 31. This year, after what has been another record breaking season, we're delighted to keep the gates open for the April School Holiday period. 

PINES regular opening hours will remain in place, except for Good Friday when we'll be closed, and there will be adjusted public holiday hours for the Easter long weekend. 

A big thank you goes out to our incredible community for another wonderful season. We can’t wait to see you all enjoying yourselves by the pool in April.
10 Years of MY Fun Run Mount Eliza! 🥳🏃‍♀️

On Sunday the sunshine and good vibes were out in full force for the 10th year of MY Fun Run Mt Eliza ☀️ 

Our superstar trainers Nic and Kristy had a blast warming up the crowd, and it was so wonderful seeing everyone who came to support this fantastic event. 

A huge congratulations to Geoff, and the entire @mymounteliza team. We can’t wait for next year’s event! 💙
⭐️ Final days to fill out our Customer Satisfaction Survey! ⭐️ 

Our 2026 Customer satisfaction Survey closes tomorrow! Have your say, and let us know your thoughts on your recent Pines experience. 

All visitors to Pines that complete the survey will be eligible to go into a draw to win a $100 Rebel Sports voucher. 

Click the link in our bio to complete the survey
Only two Free Family Fridays left this season. Make the most of it!
Last chance to register for MY Fun Run Mount Eliza 🏃 

It’s the last week to register for MY Fun Run Mount Eliza! If you haven’t signed up already, head to the MY Fun Run Mount Eliza website. PARC members can enjoy a 5% discount on their registration using our discount code.
⭐️ Last week of our customer survey ⭐️ 
This is the last week left to fill out our PINES 2026 Customer satisfaction Survey. We want to hear your thoughts on your recent Pines experience, so we would really appreciate your feedback to help us improve in the future. 

This survey should take between 4 and 6 minutes to complete and is available until close of business on Sunday 15 March 2026. 

All visitors to Pines that complete the survey will be eligible to go into a draw to win a $100 Rebel Sports voucher. 

Complete the survey via the link in our bio.
Gear up for an epic day of action! 🛹

The 2026 Skate Park Leagues (SPL) competition is coming to Frankston Skate Park on Saturday 21 March 2026! Skateboarders, scooter riders and BMX riders will hit the ramps and rails, competing for local bragging rights and earning points toward the Victorian Metro Series League Ladders. 

Date: Saturday 21 March 2026 
Time: 11am – 4pm 
Who: Riders of all ages and abilities
Location: Frankston Skate Park – 16N Cranbourne Road, Frankston VIC 3199 (behind PARC) 
Cost: Free to participate and spectate 
Register: Complete the SPL registration form via the link in our bio

Come down and enjoy a free community BBQ and cheer on the local talent!

Recent articles

30-20-2

Feel the difference with 30-20-2 

30-20-2 is a simple way to remember the right amount of regular activity which is recommended for better health.  Here’s how it works:  30 minutes daily of moderate activity OR 20 minutes

Read More »